Go top
Project information

Wind turbines predictive maintenance system

M.A. Sanz-Bobi M. García

October 1996 - December 1997

Funding entity Molinos del Ebro (Grupo SAMCA)


The fundamental purpose of this project is to watch the most representative variables evolution within the vital components of a wind turbine and so, carry out a predictive maintenance planning. This project is comprised of two parts: 1) To analyse which general structure this kind of system should have and 2) To put this system into practice by means of a model that will allow showing this projects feasibility.


AEROMANT_1996